{"id":296,"date":"2008-03-12T17:22:42","date_gmt":"2008-03-13T00:22:42","guid":{"rendered":"http:\/\/acornabbey.com\/blog\/?p=296"},"modified":"2008-03-12T17:22:42","modified_gmt":"2008-03-13T00:22:42","slug":"water","status":"publish","type":"post","link":"https:\/\/acornabbey.com\/blog\/?p=296","title":{"rendered":"Water!"},"content":{"rendered":"<p><a href=\"http:\/\/acornabbey.com\/blog\/wp-content\/uploads\/2008\/03\/water-1-w.jpg\" title=\"water-1-w.jpg\"><img decoding=\"async\" src=\"http:\/\/acornabbey.com\/blog\/wp-content\/uploads\/2008\/03\/water-1-w.jpg\" alt=\"water-1-w.jpg\" \/><\/a><br \/>\n<em>The new pumphouse. My brother, Bob, designed and built the pumphouse to harmonize with the house and the other outbuilding, which of course haven&#8217;t been built yet. <\/em><\/p>\n<p>Tuesday was a red-letter day. The guys from the plumbing company came out and installed the pump in the well. I now have water. There&#8217;s a hydrant behind the pumphouse for gardening and such, and there&#8217;s a hydrant for the trailer.<\/p>\n<p><a href=\"http:\/\/acornabbey.com\/blog\/wp-content\/uploads\/2008\/03\/water-2-w.jpg\" title=\"water-2-w.jpg\"><img decoding=\"async\" src=\"http:\/\/acornabbey.com\/blog\/wp-content\/uploads\/2008\/03\/water-2-w.jpg\" alt=\"water-2-w.jpg\" \/><\/a><br \/>\n<em>The water hydrant behind the pumphouse.<\/em><\/p>\n<p>The photos below show the process of building the pumphouse and getting the pump in the well.<\/p>\n<p><a href=\"http:\/\/acornabbey.com\/blog\/wp-content\/uploads\/2008\/03\/bob-w.jpg\" title=\"bob-w.jpg\"><img decoding=\"async\" src=\"http:\/\/acornabbey.com\/blog\/wp-content\/uploads\/2008\/03\/bob-w.jpg\" alt=\"bob-w.jpg\" \/><\/a><br \/>\n<em>This photo is from last week. Bob works on the pumphouse outside his workshop. Bob prebuilt the pumphouse in his shop so that it would be ready to deliver and assemble after the water system was working. Bob&#8217;s design for the pumphouse is an amazing combination of attractiveness and utility. He prebuilt it in sections in his shop, so it took only a day today to set it up and nail and screw it all together on site today.<\/em><\/p>\n<p><a href=\"http:\/\/acornabbey.com\/blog\/wp-content\/uploads\/2008\/03\/water-3-w.jpg\" title=\"water-3-w.jpg\"><img decoding=\"async\" src=\"http:\/\/acornabbey.com\/blog\/wp-content\/uploads\/2008\/03\/water-3-w.jpg\" alt=\"water-3-w.jpg\" \/><\/a><br \/>\n<em>The pump guys lower the pump into the well. This was Tuesday.<br \/>\n<\/em><\/p>\n<p><a href=\"http:\/\/acornabbey.com\/blog\/wp-content\/uploads\/2008\/03\/water-4-w.jpg\" title=\"water-4-w.jpg\"><img decoding=\"async\" src=\"http:\/\/acornabbey.com\/blog\/wp-content\/uploads\/2008\/03\/water-4-w.jpg\" alt=\"water-4-w.jpg\" \/><\/a><br \/>\n<em>One of the pump guys tests the new water system.<\/em><\/p>\n<p><a href=\"http:\/\/acornabbey.com\/blog\/wp-content\/uploads\/2008\/03\/water-5-w.jpg\" title=\"water-5-w.jpg\"><img decoding=\"async\" src=\"http:\/\/acornabbey.com\/blog\/wp-content\/uploads\/2008\/03\/water-5-w.jpg\" alt=\"water-5-w.jpg\" \/><\/a><br \/>\n<em>Bob assembles the pumphouse. This was today.<br \/>\n<\/em><\/p>\n<p><a href=\"http:\/\/acornabbey.com\/blog\/wp-content\/uploads\/2008\/03\/water-6-w.jpg\" title=\"water-6-w.jpg\"><img decoding=\"async\" src=\"http:\/\/acornabbey.com\/blog\/wp-content\/uploads\/2008\/03\/water-6-w.jpg\" alt=\"water-6-w.jpg\" \/><\/a><br \/>\n<em>The building is well insulated.<\/em><\/p>\n<p><a href=\"http:\/\/acornabbey.com\/blog\/wp-content\/uploads\/2008\/03\/pumphouse-gothic-w.jpg\" title=\"pumphouse-gothic-w.jpg\"><img decoding=\"async\" src=\"http:\/\/acornabbey.com\/blog\/wp-content\/uploads\/2008\/03\/pumphouse-gothic-w.jpg\" alt=\"pumphouse-gothic-w.jpg\" \/><\/a><br \/>\n<em>Hmmm. Notice any gothic elements anywhere?<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The new pumphouse. My brother, Bob, designed and built the pumphouse to harmonize with the house and the other outbuilding, which of course haven&#8217;t been built yet. Tuesday was a red-letter day. The guys from the plumbing company came out and installed the pump in the well. I now have water. There&#8217;s a hydrant behind &hellip; <a href=\"https:\/\/acornabbey.com\/blog\/?p=296\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Water!&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[17,18],"tags":[],"class_list":["post-296","post","type-post","status-publish","format-standard","hentry","category-the-house","category-the-land"],"_links":{"self":[{"href":"https:\/\/acornabbey.com\/blog\/index.php?rest_route=\/wp\/v2\/posts\/296","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/acornabbey.com\/blog\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/acornabbey.com\/blog\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/acornabbey.com\/blog\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/acornabbey.com\/blog\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=296"}],"version-history":[{"count":0,"href":"https:\/\/acornabbey.com\/blog\/index.php?rest_route=\/wp\/v2\/posts\/296\/revisions"}],"wp:attachment":[{"href":"https:\/\/acornabbey.com\/blog\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=296"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/acornabbey.com\/blog\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=296"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/acornabbey.com\/blog\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=296"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}