My driveway has been in place since last March, but now that the house and grading are done, and the boundaries of the yard are clear, I’m making a little parking and turn-around area to the left of the house. A big load of gravel was delivered today. There was no way to get the gravel in place with the dump truck. We dumped it in four piles near where it’s needed. I’m spreading the gravel with hand tools — wheelbarrow, shovel and rake. One pile down, three to go.
I did take a break during the holidays, but I’m now jumping back into the building process. I believe I’ve lined up contractors for all the interior work — electrical, plumbing, heating and air conditioning, insulation, drywall, and cabinets and trim. I’ll have more posts soon as this work gets under way.