By 3:30 p.m. today, the footings had been dug, inspected by the county, and 10 cubic yards of concrete poured. I believe that works out to around 15 tons of concrete.
On Monday the materials for the foundation walls will be delivered, and the masons should start laying blocks on Tuesday.